Exam2025Proposed solution included

CNS 400 Project Management Exam 2025

About this paper

CNS 400: Professional B-Tech Level 400 Second Semester exam (HIBMAT, under mentorship of University of Bamenda, Depts CSN/EDM/SWE/CS, Lecturer Mr. Patrick) on IT Project Management: feasibility assessment (time/fiscal/technical), IT project management definitions, internal vs professional-services teams, project-manager skills, risk/conflict/crisis management, critical vs dummy tasks, a Waterfall-vs-Agile methodology justification for an uncertain-requirements mobile wallet app, functional/non-functional/business requirements, and a Critical Path Method network-diagram problem (11 activities) requiring the critical path and project completion time.

Open in Shoracy

Opens this paper in the app on your phone.

HUIB (HIBMAT) Buea

Engineering & Technology

Computer & Communications Engineering

CNS4002025

Project Management

Exam · Second Semester · Level 400

From this paper

  1. 1.

    A) Discuss on time, fiscal, and technical feasibility assessment of a project. (9) B) Define IT Project Management. (2) C) In an IT Company, Differentiate between an Internal IT Team and a Professional services team. (4)

  2. 2.

    A) Give three skills that a project manager must have. (3) B) Discuss the concepts of project risk, project conflict and project crisis management. Name two actions an IT Project Manager can execute in order to minimize a conflict and two actions that can aggravate a conflict. (10) C) Differentiate between a critical task and a dummy task. (2)

Open in the app to read the full paper and its proposed solution.

View solutionOpen in Shoracy

At a glance

Course code
CNS400 (CNS 400)
Type
Exam
Year
2025
Level
Level 400
Semester
Second Semester
Proposed solution
Included

Read CNS400 2025 in Shoracy.

  • Every page, with zoom for diagrams and small print
  • The proposed solution, one tap away
  • Stays on your phone after the first open, even offline
Open in Shoracy