TD2024Corrigé proposé inclus

EEC 420 Power System Analysis TD 2024

À propos de ce sujet

TD 2024 de EEC420 (EEC 420) Power System Analysis (Niveau 400, Second semestre), College of Technology - COT, University of Buea : ancien sujet disponible sur Shoracy. Corrigé proposé inclus.

Ouvrir dans Shoracy

Ouvre ce sujet dans l'appli sur votre téléphone.

University of Buea

College of Technology - COT

Electrical / Renewable - EET/REN

EEC4202024

Power System Analysis

TD · Second semestre · Niveau 400

Extrait du sujet

  1. 6.

    A single phase overhead transmission line delivers 1100 kW at 33 kV at 0.8 p.f. lagging. The total resistance and inductive reactance of the line are 10 Ω and 15 Ω respectively. Determine: i) sending end voltage ii) sending end power factor and iii) transmission efficiency.

  2. 7.

    An overhead 3-phase transmission line delivers 5000 kW at 22 kV at 0.8 p.f. lagging. The resistance and reactance of each conductor are 4 Ω and 6 Ω respectively. Determine: i) sending end voltage ii) percentage regulation and iii) transmission efficiency.

Ouvrez l'appli pour lire le sujet complet et son corrigé proposé.

Voir le corrigéOuvrir dans Shoracy

En bref

Code du cours
EEC420 (EEC 420)
Type
TD
Année
2024
Niveau
Niveau 400
Semestre
Second semestre
Corrigé proposé
Inclus

Lisez EEC420 2024 dans Shoracy.

  • Chaque page, avec un zoom pour les schémas et les petits caractères
  • Le corrigé proposé, à portée de doigt
  • Reste sur votre téléphone après la première ouverture, même hors ligne
Ouvrir dans Shoracy