Rattrapage2020Corrigé proposé inclus

PETE 4105 Drilling Engineering II Rattrapage 2020

À propos de ce sujet

Rattrapage 2020 de PETE4105 (PETE 4105) Drilling Engineering II (Niveau 400, Rattrapage du premier semestre), National Higher Polytechnic Institute - NAHPI, University of Bamenda : ancien sujet disponible sur Shoracy. Corrigé proposé inclus.

Ouvrir dans Shoracy

Ouvre ce sujet dans l'appli sur votre téléphone.

University of Bamenda

National Higher Polytechnic Institute - NAHPI

Petroleum Engineering - PET

PETE41052020

Drilling Engineering II

Rattrapage · Rattrapage du premier semestre · Niveau 400

Extrait du sujet

  1. 1.

    Write short notes on the following cement slurry placement techniques. (20pts) a) Primary cementing (5pts) b) Liner cementing (5pts) c) Squeeze cementing (5pts) d) Plug back cementing (5pts)

  2. 2.

    API has defined standard classes as well as standard types of cement used within oil and gas wells. List the classes and define each of them. (15pts)

Ouvrez l'appli pour lire le sujet complet et son corrigé proposé.

Voir le corrigéOuvrir dans Shoracy

En bref

Code du cours
PETE4105 (PETE 4105)
Type
Rattrapage
Année
2020
Niveau
Niveau 400
Semestre
Rattrapage du premier semestre
Corrigé proposé
Inclus

Lisez PETE4105 2020 dans Shoracy.

  • Chaque page, avec un zoom pour les schémas et les petits caractères
  • Le corrigé proposé, à portée de doigt
  • Reste sur votre téléphone après la première ouverture, même hors ligne
Ouvrir dans Shoracy