PETE 5102 Production Operation Examen 2022
À propos de ce sujet
Examen 2022 de PETE5102 (PETE 5102) Production Operation (Niveau 500, Premier semestre), National Higher Polytechnic Institute - NAHPI, University of Bamenda : ancien sujet disponible sur Shoracy. Corrigé proposé inclus.
Ouvre ce sujet dans l'appli sur votre téléphone.
University of Bamenda
National Higher Polytechnic Institute - NAHPI
Petroleum Engineering - PET
Production Operation
Examen · Premier semestre · Niveau 500
Extrait du sujet
- a.
What are the main parameters to be considered during the process of designing oil and gas pump system. (6 marks) (b) Briefly classify oil and gas pumps under the two major categories. (10 marks) (c) State and briefly describe two types of heaters used in upstream operations. (10 marks)
En bref
- Code du cours
- PETE5102 (PETE 5102)
- Type
- Examen
- Année
- 2022
- Niveau
- Niveau 500
- Semestre
- Premier semestre
- Corrigé proposé
- Inclus
Provenance
Université
University of BamendaFaculté
National Higher Polytechnic Institute - NAHPIDépartement
Petroleum Engineering - PET
Autres sujets de PETE5102
Plus de sujets de Petroleum Engineering - PETLisez PETE5102 2022 dans Shoracy.
- Chaque page, avec un zoom pour les schémas et les petits caractères
- Le corrigé proposé, à portée de doigt
- Reste sur votre téléphone après la première ouverture, même hors ligne
Vous n'avez pas encore l'appli ?