Examen2023Corrigé proposé inclus

PETE 5101 Petroleum Production Engineering I Examen 2023

À propos de ce sujet

Examen 2023 de PETE5101 (PETE 5101) Petroleum Production Engineering I (Niveau 500, Premier semestre), National Higher Polytechnic Institute - NAHPI, University of Bamenda : ancien sujet disponible sur Shoracy. Corrigé proposé inclus.

Ouvrir dans Shoracy

Ouvre ce sujet dans l'appli sur votre téléphone.

University of Bamenda

National Higher Polytechnic Institute - NAHPI

Petroleum Engineering - PET

PETE51012023

Petroleum Production Engineering I

Examen · Premier semestre · Niveau 500

Extrait du sujet

  1. a.

    What are the components of a production system and their functions? (5mks) B) What is the procedure for opening and closing an oil well? (5mks) C) Briefly explain the following terms (Bubble point Pressure, Solution gas oil ratio, Oil Formation volume factor) (7mks) D) What are the different flow regimes for a vertical oil well? (5mks)

Ouvrez l'appli pour lire le sujet complet et son corrigé proposé.

Voir le corrigéOuvrir dans Shoracy

En bref

Code du cours
PETE5101 (PETE 5101)
Type
Examen
Année
2023
Niveau
Niveau 500
Semestre
Premier semestre
Corrigé proposé
Inclus

Lisez PETE5101 2023 dans Shoracy.

  • Chaque page, avec un zoom pour les schémas et les petits caractères
  • Le corrigé proposé, à portée de doigt
  • Reste sur votre téléphone après la première ouverture, même hors ligne
Ouvrir dans Shoracy