PETE 5101 Production Engineering II Examen 2021
À propos de ce sujet
Examen 2021 de PETE5101 (PETE 5101) Production Engineering II (Niveau 500, Premier semestre), National Higher Polytechnic Institute - NAHPI, University of Bamenda : ancien sujet disponible sur Shoracy. Corrigé proposé inclus.
Ouvre ce sujet dans l'appli sur votre téléphone.
University of Bamenda
National Higher Polytechnic Institute - NAHPI
Petroleum Engineering - PET
Production Engineering II
Examen · Premier semestre · Niveau 500
Extrait du sujet
- 1.
Describe the different types of tubing joints encountered in the oil and gas industry and explain why you would prefer the choice of one type over the others. (10 Marks)
- 2.
A) List five (5) factors that will influence the application of artificial lift in oil production. (5 Marks) B) List five (5) advantages of the electric submersible pump and five (5) disadvantages of the gas lift method of oil production. (10 Marks)
En bref
- Code du cours
- PETE5101 (PETE 5101)
- Type
- Examen
- Année
- 2021
- Niveau
- Niveau 500
- Semestre
- Premier semestre
- Corrigé proposé
- Inclus
Provenance
Université
University of BamendaFaculté
National Higher Polytechnic Institute - NAHPIDépartement
Petroleum Engineering - PET
Lisez PETE5101 2021 dans Shoracy.
- Chaque page, avec un zoom pour les schémas et les petits caractères
- Le corrigé proposé, à portée de doigt
- Reste sur votre téléphone après la première ouverture, même hors ligne
Vous n'avez pas encore l'appli ?